Monday, 21 October 2013

Filming 17th and 18th Oct

Due to the weather and problems of actors not having time to film, we have had to make other arrangements which meant changing our group roles slightly. As well as being director, I had to do the cinematography for all the shots in the park location. This was because I was the only member of the group that could work through lunchtime to get the shots we desperately needed. I filmed over two lunchtimes, totalling a time of around an hour to complete all the shots we needed. only a ten minute walk from our school. The shots I filmed needed lots of camera movement. I had to do tracking shots, panning shots and zoom in and out.

No comments:

Post a Comment